Invite Only • February 25, 2026

We Invented a
Tile Setting Robot.

Now we're showing it to a small group of NJ contractors.

Mysterious silhouetted form in industrial warehouse setting

Unveiling February 25

This is not a trade show.

This is not a concept demo.

It is a working robot.

The Problem

Tile installation hasn't changed in decades.

Every tile still requires a skilled worker. Manual placement, one tile at a time.

Meanwhile, labor shortages are getting worse. Projects are delayed. Margins are squeezed. And good setters are harder to find every year.

Traditional manual tile installation - worker on knees placing tiles one by one

What We Built

Tyler is an autonomous tile-setting system engineered for commercial floors.

It doesn't require hiring three more people. It doesn't need benefits, overtime, or time off. It just works.

We spent a year engineering it. Now it's ready to show.

Mysterious obscured form with tile floor in foreground

Why This Matters

This isn't about replacing your setters. It's about handling the volume you're turning down because you can't find enough people.

Tyler gives you a way to increase output without the headaches of hiring, training, and retaining more workers.

If robotics is going to change tile installation in New Jersey, you should see it before your competitors do.

Professionally completed tile installation showing perfect alignment and quality finish

Event Details

Wednesday, February 25, 2026

First public showing after one year of engineering

7:00 PM – 8:30 PM

90 minutes including live demo and Q&A

712 Ginesi Drive, Unit 6

Marlboro, NJ 07751

Limited Seating

Confirmed RSVPs only

Included:

  • Live floor demonstration of Tyler installing tiles
  • Up-close inspection during operation
  • Direct Q&A with founders and engineering team
  • Discussion of early access and partnership opportunities
  • Light refreshments

Why Attend

See the technology that could change how tile work gets done in New Jersey.

3x Faster Output

Tyler maintains consistent speed throughout shifts. No fatigue. No slowdowns. Reliable throughput that lets you take on projects you'd otherwise have to turn down.

Labor Solution

Addresses labor shortages and margin pressure simultaneously.

Close-up detail of precision mechanism over tile edge
Motion blur showing rapid precision tile placement
Abstract technical blueprint rendering with geometric shapes

What This Event Is

Live Floor Demo

Watch Tyler install tiles in real-time. See the precision, speed, and consistency firsthand.

Up-Close Viewing

Get close to the system. Inspect the work. Ask technical questions during operation.

Founder Q&A

Direct access to the engineering team. Understand the decisions, the trade-offs, the roadmap.

Early Access Discussion

Learn about partnership opportunities and early deployment options for your business.

Event Agenda

7:00 PM

Welcome & Introduction

Brief overview of HFR and Tyler

7:15 PM

Live Demonstration

Tyler installs tiles on a prepared floor

7:45 PM

Technical Q&A

Deep dive with founders and engineers

8:15 PM

Early Access Discussion

Partnership opportunities and timeline

Common Questions

What should I expect?

A working demonstration of tile installation by robot. No PowerPoint. No concept videos. Real tiles going down on a real floor.

Who should attend?

Tile contractors, flooring business owners, and installation managers who are dealing with labor constraints and looking for production solutions.

Is this a sales pitch?

No. This is a first showing. We want feedback from professionals who understand the work. Early access discussions are available for those interested.

Can I bring colleagues?

Room is limited. If you need multiple seats, please indicate that when you RSVP and we'll do our best to accommodate.

Location

712 Ginesi Drive, Unit 6

Marlboro, NJ 07751

Get Directions

Questions?

Contact us directly if you have any questions about the event.

This event has passed.