The focus

Wattson.

Wire-pulling for data centers.

Data centers are going up faster than crews can wire them. Wattson is autonomous wire-pulling for the buildout — purpose-built hardware, validated on real sites, no marketing fluff. In pilots now; full spec numbers ship when they're measured, not before.

Wattson is a two-robot system — a feeder and a puller that work together to run conduit and pull cable from device box to panel, taking on one of the most dangerous, labor-scarce jobs on a data-center site. Safety, labor scarcity, and cost make the need immediate — and the same shared brain that drives Tyler drives Wattson.

Wattson on a data-center jobsite, Puller · pulling cable on site

The spec sheet

What it's built to hit,

proven in pilots.

Tyler shipped because every spec was measured on a real floor. Wattson is in pilots now — the targets below are what it's built to do; each one converts to a measured number the moment the field confirms it, and not before.

Performance

Cable pull · target

18 ft/min

Crew · target

1 operator + 2 robots

Replaces · target

A 6-person hand pull

Hardware

System

Feeder + puller

Mission

Conduit + cable, device box to panel

Brain

Shared model · with Tyler

▸ Why now · the data-center buildout

Every AI dollar becomes a cable someone has to pull.

The AI boom is an electrical-construction boom — and the skilled labor to wire it doesn't exist. Wattson takes on the most dangerous, labor-scarce task inside that bottleneck — pulling cable from device box to panel.

$347B

US electrical construction / yr

Simpro US Electrical Industry, 2026

~$15B

Cable-pulling labor

Bottom-up estimate

Trillion $

Multi-decade AI buildout

The demand behind every data center

Be first to see Wattson.

Drop your email and we'll send pilot results, the spec sheet, and the first data-center jobsite footage the moment they're ready.

How we got here

Tyler proved it in the field. Wattson is where we focus.

Our flooring robot deployed across real sites — a daycare, a high school, a municipal building — plus a commercial LOI with a mall in Puerto Rico. That field validation is what brought us here.